Skip to main content
Strategic Land Company
Telephone 0800 246 5700 Email info@strategiclandcompany.co.uk
Local Plan Site Promotion

Local Plan Promotion: What We Manage for Landowners

A coordinated, evidence-led case maintained through site submission, assessment, consultation, examination and policy change

Land outside the current development plan may need a sustained Local Plan strategy before a planning application has a realistic prospect. A single Call for Sites form is rarely the complete promotion.

Strategic Land Company reviews the applicable plan-making process, prepares the site case, appoints the necessary advisers, coordinates evidence and maintains the opportunity through the relevant stages on the landowner’s behalf.

Why Some Land Needs a Local Plan Strategy

Planning applications are decided against the development plan and other material considerations. Where residential development would conflict with current policy, a change in the plan may provide the clearest route to establishing the principle and scale of development.

Local Plan promotion is not limited to asking for a coloured allocation on a map. The site must fit a spatial strategy, respond to evidence and show that it can be delivered with appropriate access, infrastructure and environmental safeguards.

The strength of the case depends on the exact land, authority, settlement, constraints and stage of plan preparation. A generic representation copied from another site will not establish those matters.

First Establish Which Authority and Process Apply

The correct local planning authority, plan area and statutory process must be confirmed before work begins. Administrative boundaries, joint plans, national parks, minerals and waste responsibilities or reorganised authorities can affect which documents and consultations are relevant.

England is transitioning between legacy and newer plan-making arrangements. Different authorities may use different stages, gateways, notices and terminology. Strategic Land Company checks the formal plan timetable, council resolutions, published notices, evidence base and applicable national guidance.

A consultation title alone is not enough. We identify what the authority is legally and procedurally asking for, who may respond and what evidence can properly influence that stage.

Review the Existing and Emerging Policy Position

We assess the adopted plan, neighbourhood planning position, emerging strategy, housing and employment evidence, settlement hierarchy, Green Belt or countryside policies, infrastructure plans and any earlier site assessment.

The review identifies the policy change needed for development and whether the authority is considering the relevant type and location of growth. It also shows which arguments are premature, which evidence is missing and which published assumptions should be tested.

Where the council is updating rather than replacing a plan, the scope of the review can be important. A submission should address matters genuinely open for reconsideration.

Prepare a Complete and Accurate Site Submission

An initial Call for Sites or land availability submission normally requires an accurate boundary, ownership and availability information, proposed use, approximate capacity, access details, known constraints and supporting plans.

We do not treat the form as an administrative exercise. The answers should be internally consistent and supported by the available evidence. Overstating capacity, ignoring a third-party access issue or marking the wrong boundary can undermine later assessment.

Where more than one ownership is involved, the submission should explain how the land can be assembled and delivered rather than assume cooperation.

Demonstrate Availability and a Realistic Route to Delivery

Authorities need to understand whether a site is genuinely available and capable of progressing. Ownership, tenancies, options, covenants, access rights, mortgages, ransom interests and landowner intentions can all affect that conclusion.

Strategic Land Company confirms the promotion position and identifies title or third-party matters requiring legal advice. We also explain the promoter’s funding and project-management role so that the site is not presented as a speculative boundary without a delivery team.

Availability does not mean the land must be immediately vacant. It means the interests and programme are understood and there is a credible route to bringing the site forward.

Use a Concept Plan to Test Capacity and Constraints

A credible site capacity should emerge from the land’s opportunities and constraints, not a gross-area multiplication. Access, topography, drainage, ecology, trees, landscape, heritage, utilities, open space and retained land can all influence the developable area.

An early concept plan helps the consultant team work from the same assumptions and allows the authority to understand how development might relate to the settlement. It is not a final reserved-matters layout and should remain capable of responding to evidence.

Where a larger strategic site is proposed, phasing, infrastructure and connections to adjoining land may need to be shown at an appropriate level.

Commission Proportionate Technical Evidence

The evidence needed depends on the site and plan stage. It may include planning, highways, drainage, landscape, ecology, heritage, utilities, noise, air quality, agricultural land, ground conditions or infrastructure work.

We prepare consultant briefs around the questions the plan process needs to answer. Early evidence may be high level, while later stages can require more detailed work to demonstrate that a stated constraint has a realistic solution.

Commissioning should be proportionate but not superficial. A short unsupported assertion that “there are no constraints” is unlikely to overcome a published technical concern.

Explain the Site’s Relationship With the Settlement and Strategy

A Local Plan allocates growth through an overall spatial strategy. The site case therefore needs to address more than its physical availability. Its relationship with services, public transport, employment, schools, centres, infrastructure and the existing settlement form can be central.

We assess whether the land would form a coherent extension, infill, regeneration opportunity or part of a broader strategic location. Where the site is separated or constrained, the evidence must address the actual planning issue rather than rely on proximity alone.

The case should also recognise cumulative effects and infrastructure needs arising from other proposed development.

Respond to the Authority’s Site Assessment

Land availability assessments, site selection reports and topic studies may identify constraints, score sites or recommend whether they progress. These documents should be reviewed against their methodology, source evidence and the latest site information.

A negative conclusion may result from an inaccurate boundary, outdated data, an assumed access problem, a capacity error or a policy judgement. We distinguish factual corrections from planning disagreement and provide evidence accordingly.

Inclusion in an assessment is not an allocation, and exclusion is not always the end of the opportunity. The significance depends on the process stage and reasons given.

Make Representations That Address the Actual Consultation

Each consultation has a purpose. An early options exercise may seek views on strategy, while a later publication plan may require precise representations on legal compliance, soundness or the proposed policy wording. A response should match that purpose.

Strategic Land Company coordinates the planning case and technical appendices, checks submission requirements and ensures that key points can be traced to supporting evidence. We avoid filling a representation with unrelated material that obscures the central issue.

Where an online portal limits text or attachments, we plan how the formal form, statement and evidence pack work together and retain proof of submission.

Compare the Site With Reasonable Alternatives

Authorities often compare a number of possible locations. A strong promotion does not simply state that the land is suitable; it explains how its accessibility, impacts, infrastructure, capacity, deliverability and mitigation compare with the assumptions applied to alternatives.

The comparison must be fair and evidence-led. It should not rely on unsupported criticism of another landowner’s site. The purpose is to test whether the authority has used a consistent methodology and whether the proposed strategy is justified.

Changes in competing sites, infrastructure or delivery can alter the comparison and should be monitored throughout the plan process.

Address Sustainability Appraisal and Strategic Evidence

The plan evidence may include sustainability appraisal, transport modelling, Green Belt review, landscape studies, infrastructure plans, housing needs, viability and settlement assessments. These documents can shape both the strategy and individual site conclusions.

We identify the assumptions relevant to the land and coordinate specialist input where necessary. A representation should explain why an assumption is wrong or incomplete and what difference the correction makes to the plan—not merely disagree with the score.

Where a reasonable alternative has not been assessed properly, the issue needs to be raised at the appropriate stage with a clear explanation of the site and potential implications.

Maintain the Case Through Examination and Modifications

Submission of the plan for examination does not automatically end the landowner’s involvement. The Inspector may consider the strategy, evidence, legal process and representations, and the authority may propose changes or modifications.

Where the site’s case is directly affected, Strategic Land Company reviews the examination documents, coordinates written responses and considers whether participation at a hearing is justified and permitted. The focus must remain on matters within the examination rather than treating it as a new unrestricted Call for Sites.

Proposed modifications can create, remove or alter opportunities, but their procedural scope must be understood before a new site case is advanced.

Consider Whether an Application Route Should Run Alongside the Plan

In some circumstances, technical work and an application can progress while the Local Plan is being prepared. This may help demonstrate deliverability or respond to a changing planning balance. In other cases it may be premature, costly or inconsistent with the best promotion strategy.

We assess the adopted policy position, emerging plan weight, housing and delivery context, site evidence, likely decision route and appeal prospects before recommending parallel work.

The two routes should share one evidence base and masterplan. Conflicting capacities, access assumptions or mitigation positions can damage credibility.

Keep the Landowner Informed Without Requiring Them to Run the Project

Local Plan promotion involves long periods in which the most important work is monitoring evidence, preparing for a future stage or resolving a technical issue rather than making a visible submission every month.

Our reports explain the current plan stage, work completed, expenditure, changes in risk, forthcoming dates and decisions requiring landowner involvement. We also explain when further work is not yet proportionate.

The landowner retains ownership and agreed decision rights while Strategic Land Company manages the planning and consultant programme on its behalf.

What a Successful Local Plan Promotion Should Achieve

The immediate objective may be allocation, a supportive policy, removal of an identified obstacle or recognition of the land within the authority’s development strategy. The commercial objective is a clear and deliverable route towards an acceptable planning permission and eventual sale.

Allocation itself does not remove the need for a planning application, technical evidence, obligations, infrastructure or market testing. The promotion strategy should therefore anticipate the application and sale stages rather than end at the plan adoption date.

Strategic Land Company funds and coordinates that complete route where we enter a Promotion Agreement, subject to the site continuing to justify the investment and strategy.

Landowner questions

Questions About Local Plan Promotion

Is submitting land to a Call for Sites the same as promoting it?

No. A submission places the land before the authority, but the site may then be assessed, compared, discounted, reconsidered and consulted upon through several stages. Active promotion involves monitoring the process, responding to evidence and maintaining a deliverable case.

Does inclusion in a HELAA or similar assessment mean the land will be allocated?

No. Assessment can indicate whether land is considered suitable, available or achievable for a particular purpose, but it does not itself allocate the site or grant planning permission. The authority still considers strategy, alternatives, infrastructure, policy and consultation.

Can land rejected at an early stage be promoted again?

Potentially. The reasons must be analysed. New evidence, a revised boundary, an access solution, policy change or a weakness in the assessment may justify a further submission or representation. Repeating the same unsupported case is unlikely to help.

Can a planning application be prepared while the Local Plan is progressing?

Sometimes. The two routes can be complementary, but an application should be based on the site’s policy position, technical evidence and planning balance. Running parallel work without a clear purpose can increase cost or expose avoidable risk.

Will Strategic Land Company attend a Local Plan examination?

Where the site’s case and the examination procedure justify participation, we coordinate the planning and technical team and the necessary written or oral submissions. Participation is not automatic and must be proportionate to the issues being examined.

Can you guarantee that the site will be allocated?

No. Allocation is a public planning decision affected by strategy, evidence, alternatives, consultation and examination. We can prepare and manage a credible case, identify weaknesses and respond to changes, but cannot guarantee the authority’s or Inspector’s conclusion.

Address

Strategic Land Company
13 Ensign Business Centre
Westwood Way
Coventry
CV4 8JA

Telephone 0800 246 5700